§ 108-28. Proper design. |
§ 108-29. New sewers subject to approval, fees, inspection, testing, and reporting. |
§ 108-30. Plans, specifications, and pipe test results required. |
§ 108-31. Submittals required. |
§ 108-32. Coordination of work with Superintendent required. |
§ 108-33. Materials and workmanship. |
§ 108-34. Test and inspections. |
§ 108-35. Manufacturers. |
§ 108-36. Gravity sewer pipe. |
§ 108-37. Lining, special lining, special backfill and special backfill mix for gravity sewers. |
§ 108-38. Gravity sewer pipe installation. |
§ 108-39. Sewer leakage tests. |
§ 108-40. Manholes. |
§ 108-41. Pumping stations and force mains. |
§ 108-42. Final acceptance, record drawings and warranty/surety. |
§ 108-43. Liability insurance coverage during construction period. |
§ 108-44. Easements. |
§ 108-45. Restoration. |